Zenith XBV243 series Service Manual page 67

Hide thumbs Also See for XBV243 series:
Table of Contents

Advertisement

FRAME ASSEMBLY UP/DOWN
Note: Put the Base Main face down (Bottom Side)
1) Release the Screw (S4)
2) Unlock the Locking Tab (L3) in the direction of the
arrow and then lift up the Frame Assembly Up/Down to
separate it from the Base Main.
Note:
• When reassembling move the Guide Up/Down in di-
rection of arrow (C) until it is positioned as Fig (C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig (B).
BELT LOADING(FIG. 4-4)
Note: Put the Base Assembly Main in original position (Top
Side)
GEAR PULLEY (FIG. 4-4)
1) Unlock the Locking Tab (L4) in the direction of the
arrow (B) and then separate the Gear Pulley from the
VR168 - 923-03485
MECHANISM - DVD
Base Main.
GEAR LOADING (FIG. 4-4)
GUIDE UP/DOWN (FIG. 4-4)
1) Move the Guide Up/Down in direction of arrow (A) as
in Fig.(A)
2) Push the Locking Tab (L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
Note: When reassembling place the Guide Up/Down as in
PWB ASSEMBLY LOADING
Note: Put the Base Main face down(Bottom Side)
1) Release 2 Screws(S5)
2) Disconnect the Loading Motor Connector from the
Hook (H1) on the Base Main.
3) Unlock 2 Locking Tabs(L6) and separate the PWB As-
sembly Loading from the Base Main.
BASE MAIN(FIG. 4-4)
Fig. 4-4
4-31
Fig (C) and move it in the direction of the arrow (B)
until it is locked by the Locking Tab (L5). And confirm
the Guide Up/Down as in Fig (A).
D35E COMBO - SERVICING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents