Trotec TFV 20 Operating Manual

Trotec TFV 20 Operating Manual

Hide thumbs Also See for TFV 20:

Advertisement

Quick Links

TFV 10 / TFV 20 / TFV 30
EN
OPERATING MANUAL
TURBO FAN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TFV 20 and is the answer not in the manual?

Questions and answers

Summary of Contents for Trotec TFV 20

  • Page 1 TFV 10 / TFV 20 / TFV 30 OPERATING MANUAL TURBO FAN...
  • Page 2: Table Of Contents

    Information marked with this symbol indicates that the operating manual must be observed. Wear hearing protection Information marked with this symbol indicates that you should wear hearing protection. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 3: Safety

    • Before carrying out maintenance, care or repair work on the device, remove the mains plug from the mains socket. Hold onto the mains plug while doing so. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 4: Information About The Device

    Switch the device off and disconnect it from the mains. 2. Remove persons from the danger area. 3. Do not reconnect a defective device to the mains. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 5: Tfv 10

    Air outlet Operating hours counter Skids Transport handle Air inlet Air outlet Cable holder Skids Service power socket Air inlet Dual counter (operating and kilowatt hours) Cable holder Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 6: Transport And Storage

    Rotary switch for fan stages Dual counter (operating and kilowatt hours) Info Do not take the devices into operation when stacked. Stacking rules out an efficient usage of the devices. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 7: Assembly And Start-Up

    3. Make sure that at the bottom the three-way hose distributor is positioned flush with the device. 4. Close both clamps of the three-way hose distributor. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 8: Operation

    • Insert the mains plug into a properly secured mains socket. Operation Operating elements TFV 10 No. Designation Switch for fan stage selection 8. Check the hoses for tight fit. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 9 • Store the device according to the Storage chapter. Service power socket Rotary switch for fan stages Electricity meter LED Dual counter (operating hours counter and MID-certified kilowatt hours counter) Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 10: Available Accessories

    • Check the power cable and mains plug for damages. • Check the on-site fusing. Note Wait for at least 3 minutes after maintenance and repair work. Only then switch the device back on. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 11: Technical Annex

    Dimensions (L x W x H) 343 x 335 x 355 (mm) disposal of hazardous substances potentially contained in the Weight 12 kg equipment. Operating manual – turbo fan TFV 10 / TFV 20 / TFV 30...
  • Page 12 Trotec GmbH & Co. KG Grebbener Str. 7 D-52525 Heinsberg +49 2452 962-400 +49 2452 962-200 info@trotec.com www.trotec.com...

This manual is also suitable for:

Tfv 30

Table of Contents