Download Print this page

SBM B6 SX User Instructions page 7

Gas infrared heaters. sx series
Hide thumbs Also See for B6 SX:

Advertisement

IGNITION :
 Open the main gas valve.
 Switch the power on.
 Start the heater ignition cycle.
 If the flame is not lit after 45 seconds, start a second ignition cycle.
 If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
SHUT-OFF :
 Close the main gas valve.
 Switch the power off.
MAINTENANCE:
 To be performed once a year by your SBM installer, according to the
SBM SX INSTALLER INSTRUCTIONS No. 05000048.
.
Manufacturer
SBM
3 cottages de la Norge 21490 CLENAY - FRANCE
Agent's stamp :
GAS INFRARED HEATERS
SX USER GUIDE
N° 05000004/5
(TO BE DISPLAYED NEXT TO THE CONTROL UNIT)
M A N U A L O P E R A T I O N
Installer's Stamp :

Advertisement

loading