Clearances - Baxi Megaflo 2 System 24 Compact User's Operating Instructions & Important Warranty Information

Gas fired wall mounted condensing system boiler
Hide thumbs Also See for Megaflo 2 System 24 Compact:
Table of Contents

Advertisement

5mm Min
Fig. 3
450mm
For Servicing
Purposes
5mm
In Operation
Fig. 4
Boiler
Example of condensate
Fig. 5
drain system
8
© Baxi Heating UK Ltd 2013
5mm Min
390mm
175mm Min (300mm Min if
700mm
150mm* Min
300mm
(290mm with flap removed)
Any pipe outside MUST be
insulated. If the pipe run
inside is in an unheated area
it must also be insulated.
using 80/125 flue system)
At least
1.5°

5.0 Clearances

5.1
For your Safety
1. This appliance must have been installed in accordance
with the manufacturer's instructions and the regulations in
force.
2. Any modification that may interfere with the normal
operation of the appliance without express written
permission from the manufacturer or his agent could
invalidate the appliance warranty. In GB this could also
infringe the Gas Safety (Installation and Use) Regulations.
GB - Heating Industry definition meaning England, Scotland,
Wales, Northern Ireland, Isle of Man and the Channel Isles
3. Your boiler must not be operated without the casing
correctly fitted.
4. Do not interfere with any sealed components on this
boiler.
5. Take note of any warning labels on your boiler.
6. Your boiler should have the following minimum
clearances for Safety and Maintenance
(Figs. 3 & 4):-
Top
- 175mm
Bottom
- 150mm*
Left side
- 5mm
Right Side
- 5mm
Front
- 5mm (In Operation)
- 450mm (For Servicing)
*This is MINIMUM recommended dimension. Greater
clearance will aid installation and maintenance.
7. If your boiler is installed in a compartment, do not use it
for storage purposes. Do not obstruct any purpose
provided ventilation openings.
8. Flammable materials must not be stored in close
proximity to your boiler.
9. Avoid skin contact when your boiler is in operation, as
some surfaces may get hot e.g. pipework.
10. Ensure that the flue terminal, outside the house, does
not become damaged or obstructed, particularly by foliage.
11. It is important that the condensate drain system is not
blocked, modified or damaged in any way as this would
affect the operation of your boiler. Your installer should
have insulated any exposed pipework (Fig. 5).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents