4 Deployment Procedure
Example 2 (Vertical)
10 m
Example 3 (Vertical)
10 m
Notice
•
It may not be possible to create an Air Sync Group that spans multiple floors, because the dividing
ceilings may weaken the signal too much. In this case, locate a connecting SIP-CS in the staircase
between each floor.
•
When creating an Air Sync Group that spans multiple floors, make sure that you conduct a site survey
on each floor.
•
Make the SIP-CS that is adjacent to most other SIP-CSs (in all 3 dimensions) into the Master CS.
Air Synchronisation
Air synchronisation assigns classifications to SIP-CS and establishes connections based on those
classifications. This creates a robust system where the whole system is not reliant upon one SIP-CS.
32
Installation Guide
10 m
10 m
10 m
10 m
10 m