MOTO GUZZI Engine V1100 Workshop Manual page 47

Table of Contents

Advertisement

ENGINE
Check the timing, with reference to the timing diagram,
considering that:
A – intake starts before TDC
B – exhaust ends after TDC
C – exhaust starts before BDC
D - intake ends after BDC
Screw the dial gauge and its support into the right
cylinder external spark plug hole.
Secure the index (part no. 17.94.75.60) in the threaded
hole to the right of the crankcase using a screw.
Turn the degree wheel clockwise until reference "D"
matches the reference at the center of the gearbox
inspection hole (valves closed).
Repeat the procedure described previously for the left
cylinder.
If the check shows that everything is fine, set operation
clearance between the rocker arms and valves [intake
0.10 mm (0.0039 in), exhaust 0.15 mm (0.0059 in)].
Remove the degree wheel hub (part no. 65.92.84.00),
the degree wheel (part no. 19.92.96.00), the index
(part no. 17.94.75.60) and the support with the dial
gauge.
Refit the spark plugs and all parts previously removed.
3 - 20
Engine V1100

Advertisement

Table of Contents
loading

Table of Contents