Installation Checklist - Vesta VRC-100 Installation Manual

Revolution condensing combi-boilers
Hide thumbs Also See for VRC-100:
Table of Contents

Advertisement

Installation Checklist

After the boiler installation, examine the following checklist. If you are not able to answer "Yes" to all of the items in the checklist, review the
appropriate sections. To troubleshoot any operational problems, refer to "Troubleshooting" in the User's Manual.
If there are additional questions or if you need assistance, contact technical support at 1-800-761-0053.
Have you maintained the required clearances from building openings and intake air vents?
Have you minimized the distance between the boiler and the vent termination?
Have you minimized the distance between the boiler and major fixtures?
Have you maintained the proper service and maintance clearances?
Is the make-up air supply sufficient for proper operation?
Is the make-up air supply free from dust, dirt, corrosive elements, and flammable vapors?
Is the boiler and vent piping clear of combustible materials, including clothing, cleaning materials, and rags?
Does the gas supply match the type specified on the boiler's rating plate?
Is the gas line at least 1/2 or 3/4 in ID (Inner Diameter)?
Is the gas supply line sufficient in length and diameter to deliver the required BTUs?
Have you measured the pressure of the gas supply line?
Is the gas supply pressure within the recommended ranges specified in this manual?
Is the gas supply line equipped with a manual shut-off valve?
Have you tested the gas line pressure and all fittings for leaks?
Has the gas company inspected the installation, if required?
Installing the boiler
Connecting the Gas Supply
Check
Check
39
Installation Checklist

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrc-80Vrc-120Vrc-140

Table of Contents