Gas Piping - Vesta VRC-100 Installation Manual

Revolution condensing combi-boilers
Hide thumbs Also See for VRC-100:
Table of Contents

Advertisement

Gas Piping

• Do not connect to an unregulated or high pressure propane
line or to a high pressure commercial natural gas line.
Danger
• The boiler must be isolated from the gas supply piping
system during any pressure testing of that system at test
pressures equal to or more than 0.5 psig.
• Only a licensed professional should connect the gas
supplies.
Warning
• Before connecting the gas supply, determine the gas type
and pressure for the boiler by referring to the rating plate.
Using a diferent gas type will result in abnormal combustion
and malfunction of the boiler causing fire or explosion.
• Leak test the appliance and its gas connection before
operating the boiler.
• Do not attempt a field conversion without a VESTA.DS
conversion kit. Use the VESTA.DS conversion kit to convert
from natural gas to propane or vice versa. Failure to do so
may result in dangerous operating conditions and will void
the warranty.
• A sediment trap must be provided upstream of the gas
controls.
In the United States: The installation must conform with local codes
or, in the absence of local codes, the National Fuel Gas Code ANSI
Z223.1/NFPA 54.
In Canada: The Installation must conform to CGA B149
INSTALLATION CODES and/or local installation codes.
To ensure a sufficient gas supply, it is recommended that the boiler
be the first appliance to be connected to the gas supply line.
To connect the gas supply:
1
Determine the gas type and pressure by referring to the rating
plate.
2
Perform a pressure test on the main gas supply line.
3
Purge the gas line of any debris.
4
Determine the proper type and size for the gas line. Refer to
the gas pipe sizing tables on page 25.
5
Install a union.
6
Install a manual gas shut off valve on the gas supply line
within easy reach of the appliance.
• Improper installation of the manual gas shut-off valve may
result in property damage, personal injury or death.
Warning
• Only a licensed professional, in accordance with the ANSI
Z21.1/CSA 9.1, should install the manual gas shut-off valve.
26
Installation Manual
7
Connect the gas supply line.
8
Check for gas leaks at all joints.
Notice
• Tighten the boiler connection valves with care to avoid damage.
• Apply gas leak detection solution to all gas fittings.
• The minimum internal diameter required for any appliance connector
is 3/4".
• When using flexible gas lines, ensure that the pipe's inner diameter
and connector is sufficient to supply the required BTUs. Also, ensure
that the flexible line has no crimps or tight bends in it, as this will
restrict gas flow.
• To facilitate any future maintenance or service, the installation of a
union on the gas supply line close to the boiler is recommended.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrc-80Vrc-120Vrc-140

Table of Contents