1 - TECHNICAL DATA Voltage 220 - 240 V 60 Hz Mx. imput power 1350 W 1.1 - COFFEE SECTION Coffee temperature probe 98 °C Hot water temperature probe 98 °C Thermal fuse TCO 192 °C Heating element 600 + 600 W Pump Type ULKA EP5...
2 - ELECTRICAL DIAGRAMS 2.1 - BASIC DIAGRAM Reed Sensor IFD Boiler Temp. Sensor Coffee Temperature Sensor Hall Sensor Water Flow Meter Motor Filter Board Ifusor Group Motor Grinder Motor Cooling Fan Motor Board SOI 06.09 FV 5/10 599 72 00-47...
3 - OPERATING ELEMENT TEST PROCEDURE TEST PROCEDURE CORRESPONDENCE BETWEEN ICON AND OPERATING ELEMENT icon Operating element Pump Upper motor MENU When the appliance is in stand-by mode (not operating) and the main switch 1 cup Tank however in position I, open the service door and press simultaneously the icons MENU, 1 CUP and HOT WATER for at On / stand by...
- DISPLAY TEST PROCEDURE TEST PROCEDURE CORRESPONDENCE BETWEEN ICON AND OPERATING ELEMENT NOTE icon position BUTTON 0 MENU BUTTON 1 When the appliance is in stand-by mode (not BUTTON 2 operating) and the main switch however in position I, open the service door TASTE BUTTON 3 LOAD TEST...
- WATER FLOW DIAGRAM SOI 06.09 FV 9/10 599 72 00-47...
Page 10
- GRINDER SET-UP Remove the coffee beams Turn the white shaft clockwise Verify the position of the white container, the back finger saver till it stops. Remove the upper basket (has to be as on the and the knob. part of the grinder by pulling it picture).
Need help?
Do you have a question about the EBA6310X and is the answer not in the manual?
Questions and answers