Electrical Connection; Scrapping - Danfoss DHP-AQ Mini Service Instructions Manual

Dhp-aq series
Hide thumbs Also See for DHP-AQ Mini:
Table of Contents

Advertisement

Refilling must only be carried out using new refrigerant (for the amount and type of refrigerant see manufacturer's
plate) through the service valves.
Caution! All warranties from Danfoss are void if, when filling with refrigerant other than Danfoss A/S
specified refrigerant, if there has not been written notification that the new refrigerant is an approved
replacement refrigerant together with other remedies.
2.2.4

Scrapping

Caution! When the heat pump is to be scrapped the refrigerant must be extracted for disposal. Local rules
and regulations related to the disposal of refrigerant must be followed.
2.3

Electrical connection

DANGER! Hazardous electrical voltage! The terminal blocks are live and can be highly dangerous due to
the risk of electric shock. All power supplies must be isolated before electrical installation is started. The
heat pump is connected internally at the factory, for this reason electrical installation consists mainly of
the connection of the power supply.
Warning! Electrical installation may only be carried out by an authorised electrician and must follow
applicable local and national regulations.
Warning! The electrical installation must be carried out using permanently routed cables. It must be
possible to isolate the power supply using a multi-pole circuit breaker with a minimum contact gap of 3
mm.
2.4
Important information
Caution! A normal heating system always contains a certain amount of corrosion particulates (rust) and
sludge products from calcium oxide. This comes from acid that is naturally occurring in the fresh water
that the system is filled with. It is not good practice to have to fill the heating system regularly which is
why any leakage in the heating system should be repaired immediately. Normal filling should occur only
once or twice a year. The water in the heating system should be as clean as possible, always position the
dirt filter on the return line from the heating system to the heat pump, as close to the heat pump as
possible.
Caution! Hard water; Normally it is not a problem installing a heat pump in areas with hard water because
the normal operating temperature for the hot water does not exceed 60°C. In areas where there are
exceptional prevailing conditions with the water one can install a softening filter, which softens the water,
cleans any impurities and prevents the build up of calcification.
Service instructions VMGFJ102 – 7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dhp-aq midiDhp-aq maxi

Table of Contents