Refrigeration; Figure 3. Compressor Unit Bracket Installation; Figure 4. Compressor Unit Clearance - EarthLinked Prime Series Quick Start Instructions

Psc geothermal heating and cooling system
Table of Contents

Advertisement

Placement instructions for other pieces of equipment that make up the EarthLinked
included with those pieces of equipment and are listed in this manual under Equipment Manuals.
3)

Refrigeration

®
After the EarthLinked
system tubing is run from the compressor unit to the other components, as appropriate. Figure 5
illustrates the refrigeration and electrical connection points for the compressor unit.
EarthLinked
equipped with an EarthLinked
(1) Required by the performance tables; OR
(2) System is in a Cooling dominant application where soil thermal
conductivity is unknown or known to be poor (less than 1
BTU/hr.ft.°F). Examples of such soils are light dry soil, dry sand, peat
and organic soils, dry clay and hardpan; OR
(3) In any system where soil thermal conductivity is unknown or known
to be poor (see (2) for definition) and ambient outdoor temperatures
have exceeded the outdoor summer design temperature conditions
for a continuous system run time of at least 7 hours.
PSC-QS (10/16)

Figure 3. Compressor Unit Bracket Installation

Figure 4. Compressor Unit Clearance

compressor unit and other system components are placed, the refrigeration
IMPORTANT!
®
compressor units that provide space cooling shall be
®
Hybrid Cooling Module (HCM) when:
®
System are
Page 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Prime Series and is the answer not in the manual?

Questions and answers

Table of Contents