Venting system for pellet, corn, oil, and biofuel appliances

Advertisement

3. Measure and record the dimensions as
shown in (Figure 18).
4. Use dimension "A" to determine total pipe
requirements. Add 12 additional inches to
ensure the termination is an adequate distance
above the roofline.
5. The gross pipe required will be dimension
"A" plus 12 inches. Five feet of this will be Flex
Pipe. The remainder will be rigid pipe. For
each joint, subtract 1-1/2 inches to allow for
the overlap. You may need extra pipe, or an
adjustable length pipe section to achieve the
correct height.
6. Assemble the first rigid Pipe Section to
the Flex Pipe, ensuring that the "UP" arrows
shown on the pipe labels are, in fact, pointing
up. Push the sections together and twist to
lock. Screws are not required for a firm lock,
Figure 20
SECURE PELLET
VERTICAL CAP
SECURE PELLET
RIGID PIPE
however, should it be desired to use them, use
stainless steel sheet metal screws 1/4-inch
long - do not penetrate the inner liner of the
pipe.
7. Repeat this process for the remainder of
the pipe sections, and lower the assembly
down the chimney as shown in (Figure 19).
Lower it below its normal position in order
to connect the Flex Pipe to the pipe on the
appliance. It may be necessary to tie a line to
the top section, to pull it back up later.
8. In making the connection at the appliance,
configurations other than the one shown
in (Figure 20) may be made. It may be
necessary to contact the manufacturer of the
Figure 21