Operation; Starting Up - WACKER Group IRFUN 38/115 Operator's Manual

Internal vibrator frequency converter
Table of Contents

Advertisement

Operation

5.
Operation
5.1

Starting up

Danger to life
T01036en.fm
Connection:
The machine is set to its nominal voltage at factory. Connection to
1-phase-alternating current 50 or 60 Hz.
Assembly instructions for the version without plug receptacle
Danger of electrocution!
Only a qualified electrician is permitted to assemble the plug and per-
form a safety check according to the directives in effect.
Observe the assembly instructions!
Switching on:
Switching on the machine means that the voltage and frequency of the
machine are powered up until the nominal value (soft start) preventing
the generation of critical switch-on current strengths.
The machine is suited for the connection to power generation units if
their operating voltage is between 230/115 V + 15 % for every load
type and the manufacturer of the unit permits operation of consumers
with capacitors. If the machine is operated with power generator units,
a synchronous unit should be selected as far as possible.