Download Print this page

Saito Victoria Assembling Instructions page 14

Paddle steamer

Advertisement

ASSEMBLING 11
15x15 square bar cut to
about 122mm in length
on which the engine bed will mount
● Two sheets of 16 are prepared by gluing using 2 , 3 , and
are glued to either side of the inside of 12 , and frame 7
Frame
using 2 , 3 .
● Two cypress square bars 15x15 cut to about 122mm
lengths are placed into the grooves of 16 and glue them
using 2 , 3 .
● 3 pieces of 17 are pasted together, to make an engine bed
using 2 , 3 .
● The engine bed 17 is mounted on 15x15 cypress square
bars by 4 tapping screws, therefore do not glue it at the
moment.
※ The bottom of the ship has now been tentatively completed.
※ Fill each clearance between frames and FRP hull with epoxy
adhesive. Die-cut parts should be touched with woodworking
or epoxy putty.
※ 8 in the left drawing shows the shape of after cutting frame.
1 Instant adhesive 2 5-minute Epoxy adhesive 3 30-minute Epoxy adhesive 4 6-hour Epoxy adhesive
NO 12

Advertisement

loading