Power-On Time Sequence - Huawei MG301 Hardware Manual

B2b module
Table of Contents

Advertisement

HUAWEI MG301 B2B Module
HardwareGuide
Table 3-3 Definitions of pins of the power-on/power-off and reset interfaces
Pin No.
20
22

3.4.2 Power-On Time Sequence

Make sure that the MG301 B2B module is powered on at the voltage and operating
temperature in the recommended range. Otherwise, the module may get
damaged or work improperly.
External application interfaces must be powered on after the module is powered
on.
You can power on the MG301 B2B module through the TERM_ON interface. The
software will report relevant information according to the actual settings after the module
is powered on. For example, the AT command automatically reports ^SYSSTART[1]. In
this case, the external VIO interface is enabled and supplies 2.8 V power.
[1] For specific setting information about the power-on/power-off software, see the
MG301 Series Wireless Module AT Command Interface Specification.
Figure 3-4 shows the power-on time sequence.
Figure 3-4 Power-on time sequence
Signal Name
I/O
TERM_ON
I
RESET
I
Huawei Proprietary and Confidential Copyright ©
Huawei Technologies Co., Ltd
Issue 06 (2013-06-13)
Description of the Application Interfaces
Description
Pin for controlling power-on and power-off
Pin for resetting the hardware
HUAWEI
19

Advertisement

Table of Contents
loading

Table of Contents