Indoor Unit Condensate Piping Connections; Outdoor Unit Installation; Placement Considerations - Lennox MPA012S4S-1P Installation Instructions Manual

Mla series; mpa series; mpb series; m22a series; m33a series; m33b series
Hide thumbs Also See for MPA012S4S-1P:
Table of Contents

Advertisement

Indoor Unit Condensate Piping Connections

IMPORTANT
Make sure that drain piping is properly routed and
insulated to prevent both leaks and condensation.
1. Use a field-provided hose clamp to secure the drain
line stub on the side of the cabinet to a field-supplied
1-inch (25 mm) drain line.
NOTE: Take care not to over-tighten the hose clamps this
may damage the drain line stub.
NOTE: Connection between stub and drain line must be
watertight. Apply non hardening plumbing joint
compound if needed to ensure a watertight seal.
2. Confirm proper slope (not less than 1/4 inch per foot
(18 mm per m)) and routing of condensate lines to
ensure moisture is drained away from the indoor unit.
3. Drain should be as short as possible and should
not have any droops or kinks that would restrict
condensate flow and shall be approved resistant pipe.
There must be a 2-inch (51 mm) space between the
end of the condensate drain and the final termination
point (ground, open drain, etc.) to ensure that the line
will drain freely.
4. After the system installation is complete, the
condensate drain line must be checked for leaks and
proper drainage. If a field-provided condensate pump
has been installed, it must be checked to ensure proper
operation. This check is part of the start-up process
which must be done by the installing contractor.
IMPORTANT
Drain should have a slope of at least ¼ inch per foot and
should be approved corrosion-resistant pipe. You must
confirm operation of every drain and pump in the system
as part of the commissioning procedure.
Cassette Base
Drain Pan
Figure 13. Test Condensate Drain
Cap
(Remove for test)
Pour water
here for test
Drain Plug
Cassette
Unit
(slope of at least ¼ inch per foot)
Figure 14. Indoor Unit Condensate Drain

Outdoor Unit Installation

In order to avoid injury, take proper precaution when
lifting heavy objects.

Placement Considerations

Consider the following when positioning the unit:
In coastal areas or other places with salty atmosphere
of sulfate gas, corrosion may shorten the life of the
unit. In coastal areas, the coil should be cleaned with
potable water several times per year to avoid corrosive
buildup (salt)
Some localities are adopting sound ordinances based
on the unit's sound level registered from the adjacent
property, not from the property where the unit is in-
stalled. Install the unit as far as possible from the prop-
erty line
When possible, do not install the unit directly outside
a window. Glass has a very high level of sound trans-
mission.
Install unit level
Ground
Level
Figure 15. Install Unit Level
Choose a place solid enough to bear the weight and
vibration of the unit, where the operation noise will not
be amplified
Choose a location where the hot air discharged from
the unit or the operation noise will not be a nuisance
to neighbors
Avoid installing the outdoor unit near a bedroom or
other places where noise may cause a problem
13
7-7/8in.
2~3-15/16 in.
Drain
CAUTION
Building Structure
3 ft. (1 m)
SUPPORT
STRAPS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents