Vertical balanced flue system (LAF) vertical CGG-2(K)
16
15
14
13
17
1
Gas fired boiler
2
Boiler connection (straight)
2b Boiler connection bend 90°, for connection to the gas fired boiler
3
Sliding coupling
3b Condensate trap horizontal or vertical
4
Balanced flue incl. inspection aperture 250 mm
5
Lengths of straight balanced flue: 500 mm, 1 000 mm
6
Bend 45°, for connecting two balanced flues
7
Bend 90°, for connecting two balanced flues
8
Balanced flue routing vertical, (three-layered roof outlet) for flat or pitched roof
9
Balanced flue routing horizontal, incl. cowl
10 Connection to a flue gas chimney B32 length 65 mm with air apertures
11 Rosette for internal walls
12 Rosette for external walls
13 Flat roof collar
14 Universal tile or roof plate or "Klöber" adaptor for pitched roof part 1
15 Universal tile or roof plate or "Klöber" adaptor for pitched roof part 2
16 Mounting bracket for roof outlet
17 Spacer clip
19 Balanced flue for connection to an existing room sealed balanced flue, length: 300 mm
20 Connector for balanced flue chimney length 962 mm
3062347_0309
Engineering information – balanced flue system
8
5
4
6
3
2
2
1
1
8
5
6
4
2b
1
8
5
7
4