Power On; Initialization - TP-Link T1700X-16TS Installation Manual

Jetstream 12-port 10gbase-t smart switch with 4 10g sfp+ slots
Hide thumbs Also See for T1700X-16TS:
Table of Contents

Advertisement

JetStream 12-Port 10GBase-T Smart Switch with 4 10G SFP+ Slots
The power socket, device and rack are well grounded.
The device is correctly connected to other network devices.
4.4

Power On

Plug in the negative connector of the provided power cord into the power socket of the
device, and the positive connector into a power outlet as the following figure shows.
Figure 4-3
4.5

Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond in the following order:
1. The PWR LED lights on all the time. The SYS LED and the LED indicators of all the
ports keep off.
2. After over one minute, the LED indicators of all the ports will flash momentarily and
then turn off.
3. A few seconds later, the SYS LED indicator will flash, which represents a successful
initialization.
16
Connection
Connecting to Power Supply
Note:
The figure is to illustrate the application and principle. The power plug you get
from the package and the socket in your situation will comply with the regulation
in your country, so they may differ from the figure above.
2
1

Advertisement

Table of Contents
loading

Table of Contents