Daikin RoCon BF Operating Instructions Manual page 26

Table of Contents

Advertisement

3
x
Operation
Setting and starting the screed program
The screed program already includes factory default values
which can, however, be individually adjusted.
The day on which the screed program is activated is not counted
in the runtime of the program. The 1st day starts at the change of
day at 00:00 am. On the day of activation, the setting of the 1st
program day is used for heating for the remaining time.
● Set the rotary switch to the "Configuration"
An overview is displayed.
● Use the rotary button to select the "Setup" level.
An overview is displayed.
● Use the rotary button to select the [Room thermostat]
parameter and check if it has been deactivated (see tab. 6-1).
Prior to starting the Screed function, the parameter must
be set to "Off".
● Set the Screed function in the system parameters to "On"
(see also fig. 3-21).
The screed program is activated.
● Check the screed program and set according to the manufac-
turer specifications for the screed.
– The adjustment range always lies between 0.0 and 65 °C.
– The increment is 1 °C.
Day
Factory setting
1 - 3
25 °C
4 - 7
55 °C
8
25 °C
9
40 °C
Tab. 3-10 Screed Program presettings
Operating instructions
26
position.
Day
Factory setting
10 - 19
55 °C
20
40 °C
21
25 °C
22 - 26
-
Configuration
Setup
System Configuration
Screed
Off
T-HS
Screed
On
T-HS
Screed
Fig. 3-21 Setting the screed program
Configuration
System Configuration
HC Configuration
DHW Configuration
HC Configuration
HC Function
Pump Mode
HC Configuration
Screed
Screed Program
Screed Program
Day 1 25 °C
Day 1
Day 1 25 °C
Day 1
Day 1 26 °C
Daikin RoCon
Daikin Control unit
008.1543999_00 – 03/2017 – EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ehs157034Ehs157068

Table of Contents