Stow Confirmation; Setting Stow And Unstow Positions; Figure 3-4 Rear Of Positionit Rack Mount Controller; Figure 3-5 Front Panel Of Positionit Rack Mount Controller - Will Burt Position It RACK MOUNT CONTROLLER Operator's Manual

Table of Contents

Advertisement

3.5 Stow Confirmation

A stow confirmation signal is provided on the rear of the unit through the Phoenix connector
(Figure 3-4). This is provided on Pin 8 as a switched ground.
Once a stow command is sent, the positioner will move to its pre-programmed stow position.
Once this stow position is reached and the positioner has fully stopped this ground on pin 8 will
become active.
Any further input to the positioner will cancel this and the ground will be removed.
Note: This stow confirmation function will not work if the stow command is sent from the
Joystick Control. The unit will stow but no confirmation signal will be shown.

3.6 Setting Stow and Unstow Positions

The Stow and Unstow positions on the positioners can be programmed through the Rack Mount
Controller.
To set the Stow position:
1. Manually drive the positioner into the position required for stowing
2. Press and hold the Pan and Tilt "Left" and "Right" buttons at the same time, then, press
the "Stow" button and hold all three for (3) seconds (Figure 3-5).
3. The stow position is now set.
It is advised that the Stow position is tested after being set to ensure it been programmed
correctly.
TP-5362301-B
July 2017
Phoenix Connector

Figure 3-4 Rear of PositionIt Rack Mount Controller

Figure 3-5 Front Panel of PositionIt Rack Mount Controller

P
I
R
OSITION
T
ACK
Stow
Left
M
C
OUNT
ONTROLLER
Right
3-3

Advertisement

Table of Contents
loading

Table of Contents