Assembly Process Of Inverter Unit - Fujitsu AU*24LUAR Service Instruction

Table of Contents

Advertisement

1-2-4 ASSEMBLY PROCESS of INVERTER UNIT (For AO*30/ 36LMAWL)
1. FILTER PCB
As shown in Fig.1, assemble FILTER PCB to INVERTER BOX A.
As shown in Fig.2, pull out the wires of FILTER PCB.
INVERTER BOX A
2. MAIN PCB
As shown in Fig.3, temporarily fix MAIN PCB to INVERTER BOX A.
After it is temporary fix of MAIN PCB, As shown in the Fig 4 - 7,
pull out the wires of MAIN PCB.
Fig.4
Fig.1
W12(Yellow)
W13(Blue)
MAIN PCB
Screw
Hook (2 places)
Screw (2 places)
FILTER PCB
Fig.5
Hook (3 places)
Fig.6/ 7
10-16
Fig.2
Fig.3