Mounting The Patch Panel - Wave2wave Rome500 Hardware Installation Manual

Table of Contents

Advertisement

8. Once the chassis is securely attached to the slider bracket system, the lift can be removed.
9. Remove the protective bottom plate that has been protecting the underside of ROME during the
installation process. The plate can be removed by unscrewing the 4 bolts at each corner of plate.
Note: If there is enough bottom clearance, the plate does not have to be removed.
10. Slide the ROME Chassis into the rack.
11. Secure the ROME to the front rack with the provided L brackets.
4.2

Mounting the Patch Panel

Sufficient cable length is provided to mount the patch panel in the front or rear of the four post rack. Once the
ROME Chassis has been fully installed in the rack, the patch panel can be secured to the rack.
The patch panel is pre-connected to ROME with a fiber cable and can be secured to the rack either before or
after the ROME Chassis is secured to the rack.
To install the patch panel, secure it to the posts of the rack using the mounting ears and screws. The patch
panel should be mounted below the slider mounting kits and above the bottom of the ROME Chassis.
Page 12
Patch Panel
www.wave-2-wave.com
Hardware
Installation Manual
Protective Bottom Plate
DOC-0001

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Wave2wave Rome500

Table of Contents