Temperature Adjustment - Price Pfister 0X8 series Installation Instructions Manual

Tub & shower single control, pressure balacing valve body
Table of Contents

Advertisement

Available languages

Available languages

13
13A
13B
13 FLUSHING
For Tub and Shower Combinations
Turn on water supply lines by rotating Stem (13A) counterclockwise allowing
water to flow from tub spout outlet (13B) until all foreign matter has cleared the
line. Water should not be flowing from shower outlet (13C) during this test. If
water is flowing from shower outlet, please check your valve to see that the
casting mark "SHWR" is facing up (see step 4).
14
14B
14 FLUSHING
For shower Only Installation
Be sure to plug Bottom Outlet with Pipe Cap or Plug (14A) using Thread Sealant.
Rotate stem (14B) counterclockwise, allowing water to flow from shower outlet
(14C) until all foreign matter has cleared the line.
If water flow becomes low or no flow at all, (refer to Step 20).
13C
14C
14A
ENGLISH
15
15A
15B
15D
FULL TRAVEL

15 TEMPERATURE ADJUSTMENT

Adjustment Gear (15A) is factory-set to prevent stem from reaching full hot
position. To adjust stem rotation: Remove Adjustment Gear (15A). Rotate
Stem (15B) counterclockwise to determine a maximum desired temperature.
Replace Gear (15A) aligning Adjustment Stop (15C) to stem Tab Surface (15D)
so Stem (15B) cannot move beyond adjusted point.
5
15B
15B
15D
15A
15B
15A
15B
15C
LIMITED TRAVEL
15A
15C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jx8 series

Table of Contents