Initial verification and start up – commissioning – should be carried out by suitable
qualified personnel.
1. Ensure that the humidifier cabinet is installed in a location where the
Clearance
2. Check that the power supply (voltage) conforms to the appliance name plate
Electrical
3. Confirm that 24Vac is present between tab 1&2 of Control terminal, located
4. Ensure that water is supplied to the humidifier. A shut-off valve should be
Water
5. Confirm that Drain piping is properly connected with a pitch of least 1.5mm
6. Check that steam distributors are properly installed into the ventilation duct.
7. Verify that the flexible steam hoses and rigid steam supply pipes are shorter
Steam
8. Ensure that a High limit duct humidistat is installed, properly connected to
9. Verify that Room humidistat or returned air duct humidistat is installed,
Controls
10. Turn Power ON at the disconnect switch
11. Confirm the control signal is matching control signal jumper on Main PCB.
12. Proceed to start-up the Humidifier, as follows:
Start-up
13. Check the location of the air flow switch in the system and its operation by stopping the
Safety test
14. Turn the humidifier OFF, by putting rocker switch of the control panel to the 0 (middle)
15. Execute a manual drain, by putting rocker switch of the control panel to the Drain
Drain and Reset
16. Reset Air flow switch and humidistat(s) to the proper value, if needed.
17. Humidifier is ready for normal operation.
End
humidifier can be serviced correctly.
on the humidifier side.
on the control connection PCB. Remove the front top cover to get to this
PCB.
outside the humidifier.
Once the water shut-off valve is turned ON, ensure that there are no
apparent leaks.
per 1m.
length than 5m in total and properly sloped and have condensation P traps
wherever required.
the humidifier and set point properly adjusted.
properly connected to the humidifier and set point properly adjusted
a)
Open the front access door of the humidifier cabinet; make sure that manual drain
valve is closed.
b)
Verify that there is a humidity demand.
Humidity demand is displayed on the humidifier LCD screen.
c)
Start up the humidifier by putting rocker switch located on the humidifier control
panel at the ON position
d)
Water will start to flow in and slowly rise in the water level sight glass located on
the side of the evaporation chamber.
Observe for water leak along the water line.
e)
Humidifier LCD screen will display the water level with 3 information:
Alarm level / Control level / High level
f)
As soon as Control level is reached, contact will be activated and heater elements
powered.
From a cold start steam will be produced 3 to 5 minutes after contactors closing
g)
Observe for water and steam leaks.
fan.
With no air movement in the air duct, the humidifier should automatically stop the
combustion burner(s).
position
position
A water jet directed on the water level sensor located in the water level sight glass
should start and create bubbles around it.
SKE-XL Steam Humidifier
Installation Instructions and User Manual
Initial verification & Start up
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ske120Ske-xlSke100Ske110Ske-xl series

Table of Contents