Beko BDIN 091 User Manual page 23

Hide thumbs Also See for BDIN 091:
Table of Contents

Advertisement

Available languages

Available languages

8
Installation instructions
• D ecide whether to saw the unloading piece off in accordance with the piping direction. (as shown
below)
C
Note: When installing the pipe at the directions 1, 2 or 4, saw the corresponding unloading
piece off the indoor unit base.
• A fter connecting the piping, install the drain hose. Then connect the power cords. After connecting,
wrap the piping, cords and drain hose together with thermal insulation materials.
• P iping joints thermal insulation:
Wrap the piping joints with thermal insulation materials and then wrap with a vinyl tape.
• P iping thermal insulation:
1. Place the drain hose under the piping.
2. Insulation material uses polythene foam over 6mm in thickness.
C
Note: Drain hose is prepared by user.
• D o not arrange the drain pipe in a way that leaves it twisted, sticking out or waving around. Do not
immerse the end of it in water.
• I f an extension drain hose is connected to the drain pipe, make sure to insulated when passing along the
indoor unit.
Air conditioner / User Manual
Piping direction
trough
Unloading
piece
Saw the unloading piece
off along the trough
Thermal insulation
4
1
3
2
wrapped with vinyl type
23 / 64 EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents