Omron ZN-CTX21 User Manual page 50

Portable power monitor
Hide thumbs Also See for ZN-CTX21:
Table of Contents

Advertisement

<Single-phase Three-wire>
Power Supply Side (K)
Load Side (L)
If the number of channels is "3CH", clamp CH1 at phase R, CH2 at phase S and CH3 at
phase T.
<Three-phase Four-wire>
Power Supply Side (K)
Load Side (L)
Important
・Take extra caution against electric shock.
・Do not insert or remove the sensor head to/from the connector when the measurement
target is clamped.
・The Portable Power Monitor unit power must be ON when clamping a measurement
target.
Branching/Fixing Hook
Branching/Fixing Hook
3-26
3. Check and Preparation
<Three-phase Three-wire>
Power Supply Side (K)
Load Side (L)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Equo series

Table of Contents