Step 1.t Flashing & L-feet
Select and install the proper code-compliant flashing
per the manufacturer's instructions. Attach
flashing components.
Step 2. Rails
Attach the
assembled T-bolts and nuts. To ensure the T-bolts are
aligned properly, make sure the line on the end of the
T-bolt is perpendicular to the rail. Tighten T-bolt to 10
ft-lbs.
Step 3. Splice Connectors
C
Splice connectors are required to connect
together. Slide a
C
until the head of the rivet stops the
Slide the end of the second
connector until the rivet head stops it. There will be a
slight gap between rails for thermal expansion.
Important: At least ONE L-foot must be installed close
to each IB splice connector. See RBI Solar RS-VS Layout
for additional information.
Step 4. End Clamps
Snap the
Secure the modules by tightening clamp to 8 ft-lbs.
Important: DO NOT apply additional anti-sieze to the clamps.
Step 5. WEEB-CCR2
Place the
slide under first module leaving enough room for the
mid clamp to snap above.
F
Step 5. Mid Clamp
Snap the
WEEB-CCR2. Slide the next module against the
clamp and tighten to 10 ft-lbs.
Important: DO NOT apply additional anti-sieze to the clamps.
rails to the
L-feet using the pre
B
A
C
splice connector in the first
rail over the
B
D
end clamp onto the
WEEB-CCR2 over the top of
E
mid clamp onto the
F
L-feet to
A
B
rails
B
rail
splice connector.
C
splice
C
B
rail as shown.
rail and
B
rail over the
B
mid