Zhone zNID-GPON-2403 Hardware Installation Manual page 35

Znid 24xx series
Hide thumbs Also See for zNID-GPON-2403:
Table of Contents

Advertisement

1
Prepare the surface for mounting.
2
Hold the bracket level in the desired location and mark the hole positions.
The holes for the fiber tray are 8 cm apart (about 3.15 inches or a little
less than 3 and 3/16 inches) on the horizontal axis and 4 cm apart (about
1.57 inches or about 1 and 9/16 inches) on the vertical axis.
3
Drill the holes.
4
Line up the fiber tray with the screw holes and attach the screws.
Use attaching hardware appropriate for the type of surface to which the
unit is mounted (i.e. wood, brick, CB, etc.).
Use shims when necessary to keep the zNID vertical.
5
Wind the fiber in the tray.
See
Optical fiber cable placement in the zNID fiber tray on page 39
6
Put the zNID on the fiber tray.
The wall mount sockets on the zNID fit the two nubs which stick out from
the fiber spool on the fiber tray.
Installation precautions
zNID Hardware Installation Guide
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents