Disassembly; Cabinet Removal; Service Position; D, A, H And N Board Removal - Siemens MCM-19T1 Service Manual

Color computer display
Table of Contents

Advertisement

MCM-19T1

2-1. CABINET REMOVAL

Cabinet
2
Two screws
1
(BVTP 4 x 16)

2-3. D, A, H and N BOARD REMOVAL

9
H board

DISASSEMBLY

Two claws
3
PUSH
PUSH
A board
1
N board
2
10
SECTION 2

2-2. SERVICE POSITION

H board
1
(additional board)
A board
2
Five screws
3
(BVTP 3 x 12)
One screw
4
(BVTT 4 x 8)
Two Cable stoppers
5
Two screws
6
(BVTP 3 x 12)
Cable bracket
7
D board
8
Holder
— 10 —
D board
3
1 When the D-board is
placed in service
position, the Safety Earth
Wire (green and yellow
wire) is disconnected.
2 After service is
completed and the
D-board reinstalled, the
Safety Earth Wire must
be reattached to the
chassis with the proper
screw. This must be
confirmed before any
subsequent procedures
are attempted.

Advertisement

Table of Contents
loading

Table of Contents