XDR-S100CD
2-11. LEVER (LOADING R/L)
torsion spring (loading RV)
torsion spring (loading LV)
lever (loading R)
two hooks
two hooks
lever (loading L)
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
Align the horizontal position.
lever (loading L)
lever (loading R)
Install the both levers so that they move symmetrically.
13