Assembling The Burner - Slant/Fin EC-25 Assembly Instructions Manual

Eutectic ec-20 oil-fired water boilers/no. 2 oil
Table of Contents

Advertisement

Step 8

Assembling the burner

Fix the gasket with the flange on the burner
door using four 3/8"–16 studs, supplied.
(screw shorter length of metric thread into
burner door.)
Push the burner into the burner
door until it will not go any further.
Fix the burner using hex nuts, supplied.
Note:
After the installation has been
connected and filled with water, start
the burner into service following the
instructions supplied with it.
4
Fix the cable in position using the
cable clamp. Slide the surplus cable
backwards between the insulation and
the front cross piece. Secure cable clamp
and tighten screw after slack is removed
from cable to make sure cable will dis-
connect when burner door is opened.
– Replace the burner cover.
EUTECTIC EC-20 SSEMBLY GUIDE
Cable Clamp
Cable routing must come
from left side for right hand
hinge (factory equipped).
If hinged door is changed
to left side, cable routing
must be moved to the right.
To be plugged
into molex plug
on burner.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec-26Ec-28Ec-27

Table of Contents