Installation Summary
Installation Summary
The basic hardware installation procedure for the Hub-7E is as follows:
1. Verify included parts
2. Verify that the hub works
3. Mount the hub
4. Complete network connections to the hub
1. Verify Included Parts
Each Hub-7E has the following components shipped with it:
HP AdvanceStack 100VG Hub-7E Installation and Reference
Guide—this manual (J3133-90001)
An AC power cord, one of the following:
Australia/New Zealand
Denmark
Europe
Japan
Switzerland
United Kingdom/Hong Kong
U.S./Canada
power supply (0950-3058)
serial cable (5182-4794)
HP 100VG AnyLAN Technology Guide
mounting hardware:
•
two number 10 by half-inch pan head wood screws
•
four 4-40 machine screws
•
mounting bracket