Installation Check List: Acu, Connectors And Wiring - Furuno FV-110 Operator's Manual

Table of Contents

Advertisement

6.2

Installation check list: ACU, connectors and wiring

Step
1.
Check that the ACU is grounded correctly,
using the mounting bolts and washers.
2.
Make sure you strain relieved the cables.
3.
Make sure that the VSAT modem is
mounted close to the ACU.
4.
Check that the ADU antenna N-connector
is properly connected with the 50 Ohm RF
cable.
5.
Check that the ACU antenna N-connector
is properly connected with the 50 ohm RF
cable.
6.
Check that the ACU's Rx Out is connected
to the VSAT modem's Rx in using the
included 1 m F-F 75 ohm cable.
7.
Check that the ACU's Tx In is connected
to the VSAT modem's Tx out using the
included 1 m F-F 75 ohm cable.
Task
Table 6-2: Installation check list: ACU, connectors and wiring
Installation check list: ACU, connectors and wiring
Verification and further
information
See To ground the ACU on
page 2-27
and
Grounding and RF
protection on page F-1.
See To install the ACU on
page 2-26.
See General mounting
considerations — VMU on
page 2-27.
Visual inspection of the
cover plate at the bottom
of the ADU.
Visual inspection of the
connector panel of the
ACU.
Visual inspection of the
connector panel of the
ACU and the VSAT
modem.
Visual inspection of the
connector panel of the
ACU and the VSAT
modem.
Done
6-3

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents