4 Assembly
4.4
Dimensions
183,5
375
33,5
78
220
1
Condensate discharge
2
Gas connection
3
Heating return
8
1
2
71
3
157,5
4
5
6
4
Heating flow
5
Connection on the back
of the air/flue pipe
6
Connection on the top
of the air/flue pipe
4.5
Minimum clearances
C
C
A
B
C
D
It is not necessary to maintain a clearance between the
product and components made of combustible materials that
go beyond the minimum clearances.
4.6
Using the installation template
▶
Use the installation template to ascertain the locations at
which you need to drill holes and make breakthroughs.
4.7
Wall-mounting the product
Note
If you are using the rear air/flue gas connection,
install the flue pipe before you wall-mount the
product.
1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
▶
Wall-mount the product as described.
Installation and maintenance instructions ecoTEC plus 0020238195_01
D
Minimum clearance
150 mm
150 mm
5 mm
(70 mm if the side sec-
tions ought to be removed)
600 mm