Chapter 2 Installation; Maximum Power Ratings For Frame; Unpacking The Module; Check The Packing List - OSEE HMV160 User Manual

High-definition multi-viewer display processor
Table of Contents

Advertisement

Chapter 2 Installation

2.1 Maximum Power Ratings for Frame

Frame
Maximum Voltage
HMV160-FR3

2.2 Unpacking the Module

2.2.1 Check the Packing List

The packing list includes one or more models of HMV160 unit, user manual, warranty card and the
other accessories.

2.2.2 Preparing the Product for Installation

Check the packing list. Contact your dealer right now if any items are missing.
Follow the procedures below before installing the module:
Check the equipment for any damage that may have occurred during transit.
Confirm all the items listed on the packing list have been received.
Remove all the packing material including electrostatic-resistant packing.
Retain these packing for future use.

2.3 Installing the Power Supply Module

The HMV160 equips with two power supply modules.
Follow the procedures below before installing the power supply module:
1. Make sure the frame stands firmly, and then unpack the fan section of the front panel.(For the
operation, please refer to the description of section 2.5 Step 1)
2. As shown below, on both sides of the front panel, make sure the power connector is installed
toward inside with the swivel handle of the fan side downward. And then push gently the
power supply module into the frame along the slot out of frame.
3. Make sure the power supply module has been pushed inside completely, and the power
connector rightly corresponds to the power hole of the frame. Fasten the screws under the
power connector to fix the module.
HMV160 High-definition Multi-viewer Display Processor
Tab. 2-1 Maximum Power Consumption
Redundant Power Supplies
480W
Yes
-5 -
User Manual
Numbers of Slots
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents