Vent/Flue Pipe & Combustion Air Pipe; Ual Certificatinon Non -Direct -Direct Ent; Aterials And Oining Ethods - Intertek MVM97 Series Installation Instructions Manual

Type fsp category iv direct or non direct vent air furnace
Table of Contents

Advertisement

V
/F
P
& C
ENT
LUE
IPE
A condensing gas furnace achieves its high level of efficiency by
extracting almost all of the heat from the products of combustion
and cooling them to the point where condensation takes place. Be-
cause of the relatively low flue gas temperature and water conden-
sation requirements, PVC or ABS pipe is used as venting material.
In addition to PVC and ABS pipe and fittings, Innoflue
Centrotherm Eco Systems and PolyPro
also approved vent and combustion air materials for installa-
tions in the U.S.A. and Canada. Manufacturers Installation in-
structions for these products must be followed. These products
have specific instructions for installing, joining and terminat-
ing. Do not mix materials or components of one manufacturer
with materials or components of another manufacturer.
All furnaces are built with 2" vent / intake pipe and connectors. For furnaces requiring installation of 3" pipe, the transition
from 2" to 3" should be done as close to the furnace as practically possible.
This furnace must not be connected to Type B, BW, or L vent or vent connector, and must not be vented into any portion of a factory
built or masonry chimney except when used as a pathway for PVC as described later in this section. Never common vent this appliance
with another appliance or use a vent which is used by a solid fuel appliance.
It is the responsibility of the installer to follow the manufacturers' recommendations and to verify that all vent/flue piping and
connectors are compatible with furnace flue products. Additionally, it is the responsibility of the installer to ensure that all piping and
connections possess adequate structural integrity and support to prevent flue pipe separation, shifting, or sagging during furnace
operation.
D
C
: N
-D
UAL
ERTIFICATION
ON
This furnace is dual certified and may be installed as a non-direct
vent (single pipe) or direct vent (dual pipe) appliance. A non-direct
vent installation requires only a vent/flue pipe, while a direct vent
installation requires both a vent/flue pipe and a combustion air
intake pipe. Refer to the appropriate section for details concerning
piping size, length, number of elbows, furnace connections, and
terminations.
M
J
M
ATERIALS AND
OINING
Two- or three-inch nominal diameter PVC Schedule 40 pipe meeting ASTM D1785, PVC primer meeting ASTM F656, and PVC solvent
cement meeting ASTM D2564 specifications must be used. Fittings must be DWV type fittings meeting ASTM D2665 and ASTM D3311.
Carefully follow the pipe manufacturer's instructions for cutting, cleaning, and solvent cementing of PVC.
The use of Schedule 40 PVC or ABS cellular core (Foam Core) plastic pipe is also acceptable as a flue/vent and intake pipe material.
PVC primer meeting ASTM F656 and PVC solvent cement meeting ASTM D2564 specifications must be used. Fittings must be DWV
type fittings meeting ASTM D2665 and ASTM D3311. Carefully follow the manufactures instructions for cutting, cleaning and solvent
cementing of PVC.
For Canadian installations; all PVC pipe, fittings and joining materials must be UL S636 listed.
As an alternative to PVC pipe, primer, solvent cement, and fittings, ABS materials which are in compliance with the
following specifications may be used: Two-or-three-inch solid wall ABS Schedule 40 pipe must meet ASTM D1527 and, if used
in Canada, must be CSA listed or, two-or-three-inch cellular core ABS Schedule 40 pipe must meet ASTM F628 and, if used in
Canada, must be CSA listed. Solvent cement for ABS to ABS joints must meet ASTM D2235 and, if used in Canada, must be
CSA listed. The solvent cement for the PVC to ABS transition joint must meet ASTM D3138. Fittings must be DWV type
fittings meeting ASTM D2661 and ASTM D3311 and, if used in Canada, must be CSA listed. Carefully follow the manufactur-
ers' instructions for cutting, cleaning, and solvent cementing PVC and/or ABS.
All 90° elbows must be medium radius (1/4 bend DWV) or long radius (Long sweep 1/4 bend DWV) types conforming to ASTM D3311.
A medium radius (1/4 bend DWV) elbow measures 3 1/16" minimum from the plane of one opening to the centerline of the other
opening for 2" diameter pipe, and 4 9/16" minimum for 3" pipe.
The use of two short radius 45 degree elbows is permitted to provide clearance to refrigerant piping above the furnace.
16
A
P
OMBUSTION
IR
IPE
®
by M&G Duravent are
/D
V
IRECT
IRECT
ENT
ETHODS
F
AILURE TO FOLLOW THESE INSTRUCTIONS CAN RESULT IN BODILY
. C
INJURY OR DEATH
AREFULLY READ AND FOLLOW ALL INSTRUCTIONS
GIVEN IN THIS SECTION
by
®
U
PON COMPLETION OF THE FURNACE INSTALLATION
INSPECT THE ENTIRE FLUE SYSTEM BOTH INSIDE AND OUTSIDE OF THE
FURNACE TO ASSURE IT IS PROPERLY SEALED
SYSTEM CAN RESULT IN SERIOUS PERSONAL INJURY OR DEATH DUE TO
EXPOSURE TO FLUE PRODUCTS
T
O AVOID BODILY INJURY
MUST BE KEPT AWAY FROM ALL IGNITION SOURCES
,
FLAMES
AND EXCESSIVE HEAT
A
VOID BREATHING CEMENT VAPORS OR CONTACT WITH SKIN AND
.
EYES
WARNING
.
WARNING
,
CAREFULLY
. L
EAKS IN THE FLUE
,
INCLUDING CARBON MONOXIDE
WARNING
,
,
FIRE OR EXPLOSION
SOLVENT CEMENTS
(
.
I
E
)
AS THEY ARE COMBUSTIBLE LIQUIDS
.
.,
,
SPARKS
OPEN
.
/
OR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cvm97 series

Table of Contents