IMPORTANT Installer and Users please note: These instructions should be read carefully and left with the user of the product for future reference. BEFORE USE Inspect the product including its cable and plug for any signs of damage. If the product is damaged, DO NOT use it, and contact your supplier immediately.
• Cleaning and user maintenance shall not be made by children without supervision. • Place the EH1369 on a firm flat surface. • Ensure that there is at least 300 mm (1') between the sides of the heater and any flammable materials •...
OPERATION Plug the mains lead into a 13 Amp mains socket. If connecting via an extension lead, make sure that the lead is rated at 13 Amps or more, and that it is fully unwound. Switch the unit on at the mains socket. Move the 3-position switch on the timer to the "I"...
£0.12 per unit (kilowatt-hour). The amount you are being charged will be shown on your electricity bill. At this cost, the EH1369 will cost £0.12 per hour to run on the "low heat " setting, and £0.16 per hour to run on the "medium heat"...
If the mains lead is damaged, it must be replaced by the manufacturer or an authorised service centre. If the mains plug needs to be replaced, proceed as follows: • Connect the brown wire to the terminal labelled "L". • Connect the blue wire to the terminal labelled "N".
If the built-in timer is being used, check that the dial shows the correct time. The EH1369 also has a overload protection device to prevent overheating. If this operates, disconnect the heater from the mains supply, and remove any objects on or adjacent to the heater that could have caused the overheating.
Operating current: 10.8 A SERVICE WARRANTY Prem-i-Air guarantees the product free from defects in materials and workmanship for a period of two years. This Elite product is guaranteed for a further twelve months subject to the enclosed registration card being completed and returned to the address printed on it, or the registration form being completed on-line at www.prem-i-air.com...