Emerson Vission 20/20 Operation And Service Manual page 225

Vilter
Table of Contents

Advertisement

Appendix B • Vission 20/20 Application Procedures
VISSION 20/20 SOFTWARE SETUP
Step 1: Confi guration Screen Selection of
Installed Boards
Logon and navigate to the Confi guration screen, page
number 6. Insure that all boards that are physically
Figure B-45. Selection of Installed Boards (Confi guration Screen – Page 6)
Vission 20/20 • Operation and Service Manual •Vilter/Emerson • 35391SC 2.0
installed into the 20/20 panel have been selected or
"checked". You should have the additional board #10
installed (analog output board) and selected.
Continue to step 2.
B - 69

Advertisement

Table of Contents
loading

Table of Contents