Ups Installation - Tripp Lite SUTX20K Owner's Manual

Smartonline sutx 3-phase ups system 20/40kva
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 1
3. Installation and Wiring

3.5 UPS Installation

There are two installation methods. One is with the balance supports and the other is without the balance supports.
Installation without the Balance Supports
After moving the UPS to its final installation area, use the levelers to stabilize the UPS cabinet on the ground.
Installation with the Balance Supports
To reinstall balance supports removed from the UPS during the unpacking process, follow these steps:
1
Once the installation area has been selected, follow the mounting hole diagram below to drill holes.
(Figure 3-1: Stabilize the UPS with Levelers)
(Front)
579 mm (22.8 in.)
660 mm (26 in.)
(Back)
(Figure 3-2: Mounting Hole Diagram)
8
Mounting Hole
(Diameter: Ø15 mm)
4 pcs.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sutx40k

Table of Contents