INSTALLATION LOCATION
REQUIREMENTS
Indoor Unit
S Confirm that the ceiling is able to support the weight of the unit.
S There should be enough room within the false ceiling for
installation and maintenance.
S The false ceiling should be horizontal and leveled.
S Install the unit in a location within the room that allows uniform
air flow in all directions.
S Do not install the indoor units near a direct source of heat such as
direct sunlight or a heating appliance.
S A location which provides appropriate clearances.
S Ensure the hanger is strong enough to withstand the unit's weight.
Indoor and Outdoor Units (General)
S Ensure space is left for access for maintenance.
S Location should be far away from where there is a heat source,
leakage of any inflammable, explosive substances, or smog.
S All wiring and refrigerant lines must be at least 3 ft. (1m) away
from sources of electromagnetic interference (such as televisions,
radios, etc.). Interference is still possible even if this distance is
maintained.
S Do not install the indoor or outdoor units in a location with
special environmental conditions. For those applications, contact
your Ductless representative.

INDOOR UNIT INSTALLATION

INDOOR DUCTED UNIT INSTALLATION
CAUTION
!
Be sure that the ceiling grid is supported separately from
the unit.
The ceiling grid must not be supported by any part of the
unit or any associated wiring or piping work.
MOUNTING THE UNIT
1. INSTALLING HANGER BOLTS − Install the hanger bolts
at the locations (see Fig. 4, top view). Use Ø10 / Ø0.394in
all−threaded rod.
Fig. 4 - Install the Hanger Bolts
2. The unit can now be lifted on to the hanging rods for
mounting.
3. Use rods and fasteners to suspend the unit at the factory
provided mounting holes.
4. Adjust the unit's height until the bottom is level with the false
ceiling, with adequate space to provide enough pitch for the
drain.
5. Secure the unit in position with lock nuts and washers on
both sides of the mounting bracket. Ensure the threaded
rod does not extend more than 2 in. below the mounting
brackets (see Fig. 5).
RETURN AIR ARRANGEMENT
Based on the return air arrangement requirement in the field, the
unit can be modified from the rear return to the bottom return.
1. Remove the return air duct collar/filter rack and plenum
bottom panel.
Fig. 6 - Remove the Return Air Duct Collar
2. Install the Seal Sponge on the bottom inlet.
Fig. 7 - Install the Seal Sponge
3. Swap the position to change the rear return to bottom return
arrangement installing the Air Return flange and the filters.
A150664
Fig. 8 - Change the Rear Return
7
Fig. 5 - Secure the Unit
A150665
A150666
A150667
A150668

Advertisement

Table of Contents
loading

This manual is also suitable for:

40mbd-04si

Table of Contents