Downflow Right- -Side Vent And Trap - Arcoaire N9MP1 Installation Instruction

90+ single stage gas furnace direct or non--direct vent fan assisted category iv furnace
Table of Contents

Advertisement

Figure 15

Downflow Right- -Side Vent and Trap

Plastic Cap
Yellow or black
SIDE VIEW
Vent Drain
& Clamps
NOTE: Built--in channel will
be angled 5° to 10° also.
Single Pressure Switch Detail
Drain Tube Corrugated
5
/
" ID & Clamps
8
Drain Connector Black
3
1
PVC
/
" PVC X
4
(Loose parts bag)
Downflow Right- -Side Vent and Trap
Remove the drain tee if installed.
Disconnect the hoses from the trap assembly, and remove trap
and trap mounting bracket from the blower compartment. Using
cover plate and gasket provided in the loose parts bag, cover the
hole from the burner compartment to the blower compartment and
secure with screws.
Move the caps to the top of the trap and mount the trap externally
to the right side of the unit using the 2 screws provided.
Connect the corrugated drain tube from the transition box to the
trap as shown. If an extension is required, use the black PVC tube
5
connector and the black
/
" ID drain tube in the loose parts bag.
8
Cut tube to length. Secure all connections with clamps.
Connect the drain hose from the Vent Drain to the trap. If an
extension is required, use the black
1
connect a black
/
" ID elbow tube and a suitable section of a
2
ID drain tube to make connection from the vent drain to the trap.
Secure all connections with clamps.
22
Representative drawing only, some models may vary in appearance.
Rotate downward
5° to 10°
Elbow Tube Black Rubber
1
/
" ID & Clamps
2
(Loose Parts Bag)
Dual Pressure Switch
/
" CPVC
2
(See Figure 15)
1
/
" OD barbed coupling,
2
Specifications are subject to change without notice
Barbed Coupling
1
/
" OD
2
(Loose Parts Bag)
Install the vent pipe grommet into the casing
Cut an appropriate length of 2" PVC pipe long , enough to exit the
cabinet and connect the vent drain to either:
A standard field supplied 2" PVC tee (N9MP1 models), or
A 2" PVC coupling fastened onto the drain tee (N9MPD and
*9MPD models)
Install tee trap into bottom section of tee.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Connect the tee trap and the main drain line exiting the casing as
shown in Figure 20.
Note:
It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
1
/
before operation. Verify all condensate drain connections are
"
2
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.
Trap Connection
Preassemble &
Relief Tube
insert into furnace
3
Black Rubber
/
" ID
16
Drain Tube
Coupling & Clamps
Black Rubber
(Optional)
1
/
" ID
2
Cut to Fit &
Clamps
On Some
2" PVC Coupling
Models ONLY
Either: The PVC
Drain Tee or a field
supplied 2" PVC Tee
Tee Trap White PVC
(loose parts bag)
WARNING
Move Caps to top of trap
Drain Tube Black Rubber,
5
/
" ID Cut to fit & Clamps
8
(loose parts bag)
"Clamp ears"
Pointed OUT
25--24--83a
440 01 1024 01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mpdN9mp2T9mpdH9mpdC9mpd

Table of Contents