Complete The Installation - Kenmore 7121 series Use And Care Manual

Hide thumbs Also See for 7121 series:
Table of Contents

Advertisement

Complete the Installation

WARNING
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong. Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.
1. Plug into a grounded 3 prong outlet.
2. Start the icemaker. Move the feeler arm to the ON
(down) position. The icemaker will not begin to operate
until it reaches its operating temperature of 15°F (-9°C)
or below. It will then begin operation automatically.
NOTE: Allow 24 hours to produce the first batch of ice.
Discard the first three batches of ice produced. Allow 3
days to completely fill ice container.
In lower water pressure conditions, the water valve may
turn on up to 3times to deliver enough water to the
icemaker.
INSTALLATION INSTRUCTIONS
Feeler arm in the STOP (up)
position.
Feeler arm in the ON (down)
position.
Front Base Grille
The front base grille which was packaged inside the
refrigerator for shipment and should be installed after the
refrigerator has been leveled.
1. Align the base grille to the screw holes.
(The cut out side on the base grille installs around the
lower hinge of the door.)
2. Secure the base grille into screw holes with Phillips
screwdriver.
NOTE: Reverse these steps to remove this style of base
grille.
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

6121 series

Table of Contents