MS420 Series (EOS) Installation Guide On Aug 1, 2016, Cisco Meraki announced the end-of-sale date for the MS420 series switch will be Oct 31, 2016. The end-of-support date is Oct 31, 2023. Read more about our Product End-of-Life (EOL) Policy.
MS420-48 Series front panel MS420 Series back panel The MS comes standard with US power cord. EU/ Power input UK/AU power cords may be ordered separately. Ports and Status Indicators The MS uses LEDs to inform the user of the device's status. When the device powers on, the main LED will be amber. Additional functions are described below, from left to right.
Page 3
Item Function LED Status Meaning Restore button to clear Restore switch IP and local configuration settings One or more of the system fans has Orange malfunctioned or is missing One of the system PSUs (power supplies) Power (PSU) Orange has malfunctioned or is missing Switch is unable to or Status...
Switch does not have power Switch Port LEDs No client connected Solid orange 10/100/1000 Mbps Solid green 10,000 Mbps (10Gbps) In addition, there is a RESTORE button available on the front panel. Insert a paper clip if a restore is required. •...
Mounting hardware The mounting hardware includes a rack mount rail kit for standard 1U racks. When installing the device, make sure that there is sufficient space between the rear of the rack and other obstacles to ensure adequate airflow.