Agilent Technologies 1290 Infinity II User Manual page 34

Preparative open-bed fraction collector
Hide thumbs Also See for 1290 Infinity II:
Table of Contents

Advertisement

3
Using the Fraction Collector
Replace Inlet/Waste Tubings
11
Install the delay sensor holder.
N O T E
Make sure that the holder is fixed properly. Press
the small button to insert the tubing properly.
13
Route the tubings clockwise (one turn) around the
robotics arm.
34
12
Route the tubings under the clamp at the robotics arm.
14
Install the tubings to the tube holder.
1290 Infinity II Preparative Open-Bed Fraction Collector User Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents