Placing The Boiler; Wall Clearances - Buderus Logano GB125 BE Installation And Maintenance Instructions Manual

Oil condensing boiler
Hide thumbs Also See for Logano GB125 BE:
Table of Contents

Advertisement

4

Placing the boiler

4
Placing the boiler
This section describes how to install and place the boiler
in the boiler room.
CAUTION: Risk of system damage due to
freezing!
B Install the heating system in a frost-free
room.
4.1

Wall clearances

Wherever possible, position the boiler with the
recommended wall clearances. Reducing the minimum
clearances makes the boiler more difficult to access.
The boiler base or foundation must be perfectly flat and
level.
The burner door is factory-installed with the hinges on the
right. The burner door can be converted to left-hand
closing.
Dimen-
sion
Wall clearance
A
Recommended
Minimum
B
Recommended
Minimum
C
Recommended
Minimum
D
Recommended
Minimum
L
Chapter 2.8, page 8
Tab. 9 Recommended and minimum wall clearances
(dimensions in inches).
The boilers are designed for a side clearance
of 6".
Where applicable, allow extra wall
clearances for additional components such
as DHW tank pipe connections, flue silencer,
other flue components, etc.
WARNING: Risk of fire from flammable
materials or liquids!
B Clearances less than 6" must comply with
local and statutory codes.
B Make sure that there is a sufficient
clearance between combustible materials
and the chimney connection as specified
by NFPA 31 (distance of 18 ").
B The floor must comply with the
requirements of NFPA 31.
14
40"
27"
27"
16"
28"
20"
16"
Fig. 8
6"
Logano GB125 BE US/CA - Subject to technical modifications.
Wall clearances in the boiler room (boiler
positioned on the right-hand side)