Lennox EL180UHE Installation Instructions Manual page 33

Hide thumbs Also See for EL180UHE:
Table of Contents

Advertisement

Start-Up & Performance Check list
2
2
1
GAS SUPPLY
1
Natural Gas
Piping Connections Tight
Leak Tested
Supply Line Pressure " W.C.________
VENT / EXHAUST PIPE
2
Secure to Unit
Elbows Secured to Pipe
Roof Flashing (water tight)
Vent Pipe Supported
Unit Model Number_______________
Serial Number___________________
Gas Supply Pressure
1
LP/Propane Gas
UNIT SET UP
(typical)
Line Voltage
5
4
3
4
5
Page 33
SUPPLY
AIR
upflow furnace shown
Filter
DUCT SYSTEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
Registers Open and Unobstructed
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
INTEGRATED CONTROL
DIP Switches Set (if applicable)
Appropriate Links in Place (if applicable)
VOLTAGE CHECK
Supply Voltage _____
Electrical Connections Tight
3
RETURN
RETURN
AIR
AIR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents