Step 3 - Installing The Power Cord Retainer - D-Link DGS-1024D G2 User Manual

Table of Contents

Advertisement

Section 3 - Hardware Installation
Step 3 – Installing the Power Cord Retainer
Installation of the power cord retainer is recommended to prevent accidental removal of the AC power cord.
A. Insert a tie wrap with the rough side facing down into the hole below the power socket.
Insert tie wrap
B. Connect the AC power cord into the AC power inlet of the switch.
Connect the power cord to the switch
D-Link DGS-1016D/DGS-1024D User Manual
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1016d g3

Table of Contents