Hanging Bracket Kit; Installation Instructions - Bosch LV009 Installation And Maintenance Manual

Lv series
Hide thumbs Also See for LV009:
Table of Contents

Advertisement

8 | Installation

Hanging Bracket Kit

Installation instructions

All horizontal units come with Hanging Bracket Kit
to facilitate suspended unit mounting using threaded
rod. Hanging Brackets are to be installed as shown in
Figure#3
Hanging Brackets Locations
Figure # 3
This kit includes the following:
(5) Brackets
(5) Rubber Vibration Isolators
(8) Screws # 10x1/2"
(10) Bolts 1/4-28x1/2" hex Bolt (not used on this
model)
The following are needed and are to be field provided:
Threaded rod (3/8" max dia)
Hex Nuts
Washers (1-3/4" min O.D.)
1. Remove and discard factory provided screws from
location where Hanging Brackets will be installed shown
in Figure#4
Figure # 4
8 733 944 336 (2016/09)
2. Mount 4 Brackets to unit corner post using the bolts
provided in the kit as shown on Figure # 5
WARNING: Do not re-use screws removed
from the unit on step 1 to mount the
hanging Brackets to the unit.
WARNING: Follow all applicable codes
requirements when hanging this unit.
Selecting threaded rod material, etc.
3. Install Rubber Grommet on the bracket as shown in
Figure# 6.
4. Hang the unit and assemble the field provided Thread
Rod, Nuts and Washers on to the Brackets as shown in
Figure# 6.
DANGER: Rods must be securely anchored
to the ceiling.
Subject to change without prior notice
LV Heat Pump Series
Figure # 5
Figure # 6
LV Heat Pump Series

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents