Aiwa HV-FX780 Service Manual page 43

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
2. Plate Assembly Top (Fig. A-2-1)
1) Unhook the (H1) and separate the Left Side.
2) Unhook the (H2) and lift up the Plate Assembly Top.
NOTE
(1) When reassembling, confirm (A),(B) Part of the Plate
Assembly Top is inserted to the (L),(R) Grooves of the
Bracket Side(L) and Bracket Assembly Door.
3. Holder Assembly CST (Fig.A-2-2)
1) Push the Lever Stopper(L),(R) in the direction of the
arrows (A), (B), and move the Holder Assembly CST.
Plate Assembly Top
Bracket Side (L)
2) Push the Bracket Assembly Door to the right and lift up
the Holder Assembly CST along the Guide Groove of the
Bracket Assembly Door.
Lever Stopper (L)
Holder Assembly CST
(A)
4. Guide CST (Fig.A-2-3)
1) Push two Hooks(H3),(H4) in the direction of the arrow
and separate the left side.
2) Unhook (H5),(H6) as above No.1) and disassemble the
Guide CST in the direction of the arrow.
(H3)
Bracket Side (L)
5. Bracket Side(L) (Fig. A-2-4)/
Bracket Assembly Door (Fig.A-2-5)
1) Remove the Screw (S1) and disassemble the Bracket
Side(L) in the front.
Bracket Assembly Door
Lever Stopper (R)
(B)
(H4)
Bracket Assembly Door
2) Remove the Screw (S2) and disassemble the Bracket
Assembly Door in the front.
6. Arm Assembly F/L (Fig. A-2-6)
1) Push the Arm Assembly F/L to the left and lift up it.
NOTE
(1) When reassembling, confirm that the Gear(A) of the Arm
F/L and the Gear(B) of the Gear Rack F/L are assembled
as below.
7. Lever Assembly S/W (Fig. A-2-7)
1) Hook the Spring Lever S/W on (H5).
2) Lift up the left side of the Lever S/W from the Groove(A)
of the Chassis.
(H5)
NOTE
(1) Place the Spring Lever S/W of the above (No.1) as
original position.
(H5)
51
Gear (A)
Gear (B)
Spring
Lever S/W
(H5)
Spring
Lever S/W
(H5)

Advertisement

Table of Contents
loading

Table of Contents