Schedule - Avalonix 94200h User Manual

Table of Contents

Advertisement

4.4.1 Schedule

The volume means the seven days of a week from Monday to Sunday; the row means 24 hours of a day. Click the grid to do
relevant setup. Blue means checked area, gray means unchecked area.
Step1: enter into system configurationschedule configurationschedule; refer to Fig 4-15:
Step2: select channel, double-click and a dialog box will pop-up as Fig 4-16. Then user can edit week schedule:
① Click "add" button to add a certain day schedule; click "delete" button to delete the selected schedule;
Copy: user can copy the specify schedule to other dates.
Click "OK" button to save the setting, click "Exit" button to exit current interface.
② User can apply the schedule setting of certain channel to other or all channels. Just only select channel and click "Copy"
button.
Step3: click "apply" button to save the setting.
Digital Video Recorder User Manual
Fig 4-15 schedule configuration-schedule
Fig 4-16 schedule-week schedule
25

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 94200h and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF